"goo goo g'joob" - John Lennon
SUBSCRIBE AND FOLLOW
RSS-Feed Newsletter Facebook Twitter AppStore Email Find out how and why

Preparing for 2011

2010 is going to be an interesting year.

This is the year we will need to prepare for 2011. The year in which we start building.
Now, when people ask when we start building, we can say.., “next year, we start building next year”.

So, what are the plans for 2010. I’ll sum them up to give an overview:

  • Find an (Belgium) architect
  • Submit for a building permit
  • Sell the house in Rotterdam
  • Move to Belgium
  • Set up a temporary dwelling on our land
  • Build a shed

Besides these actions we’ll need to learn (better) French, find suppliers, keep and find volunteers and keep working throughout everything to make money.

Wauw.., if you put it like that than 2010 is going to be a very interesting year indeed.

Architect

We need a native Belgium architect. One who speaks French as well as Dutch. This makes communication so much easier. It would help if he/she is from the south and had some dealings with our local government before.
Now, we did, or rather Laila and Lotte did speak to a potential and we hope that his price will be less enthusiastic as he was. As soon as we can agree on a price than we get cracking.
We need a somebody from Belgium because only Belgium architects can apply for building permits. Lotte would not be able to apply. A bonus is that a local architect can also help, a lot, with local contractors, and we’ll need all the help we can get with that.

Building Permit

In the talks L&L had with the architect he was very positive about the design (of course). He also suggested that it would not be a problem getting a permit on the design. Now, that is the design Lotte graduated on, it has slightly changed (see pictures).

Selling and Moving

These are a few issues that go together well. Selling the house, moving to Belgium, buying a (big) caravan and make Chenogne our home. This is also one of the most dramatic actions we will ever take in our lives and will definitely be the most dramatic move we’ll make this year.
Making a home in Chenogne will be tough, it has to be a temporary place, easily placed and maintained. But we’ll need (warm) water, electricity, something to cook on. All we have now is some grass, that’s it. A challenge to be met I’m sure.

Design

Last but not least. The house itself. Lotte has been creative again in providing solutions for our minor dilemmas.
Now, obviously all the ins and outs of the house will pass through this blog at some point, so I’ll leave you with just these images.

NorthSouth ViewWest View

design and artist impression by Studio Middelkoop

Activity

3 total comments, leave your comment or trackback.
  1. Michiel
    Jan 14th 2010

    Nice design… Could prove difficult getting the 4×4 pickup off the grid, though… :D

  2. jons smit
    Jan 15th 2010

    Bonjour,
    Je venais de lire le message ci-dessus. Des grosses nouvelles! J’espére, que vous serez bien en état d’exécuter toutes vos idées en 2010. Nous n’hésiterons pas á passer votre endroit, peut-être déjà cet été. Bon courage et surtout bonne chance!
    Cordialement, Jons

  3. It’s a 4×4.., it’ll go easily off the grid, off the road… it can go anywhere… ;)


Leave a Reply


Search

The archives run deep. Feel free to search older content using topic keywords.